Reduction of man power on site by omitting the foundation concrete.
Using KK-ONE method in the steel frame construction can omit the install of concrete foundation, by welding the steel pipe pile with steel pipe column. The procedure of excavation of waste soil, formwork, bar of steel structure are greatly reduced, help to reduce costs, man power and also shortened the period of construction.
There are 2 ways of method to do it.
1. Using the solid steel plate to weld with the steel pipe pile and steel pipe column.
2.Using the solid steel plate or H beam steel to weld with the steel pipe pile and steel pipe column directly.